From late September to October, upgraded parts were installed at one pilot water monitoring station and one pilot air monitoring station in Bac Ninh Province. Training sessions were also conducted for the staff of the Bac Ninh Center for Environmental Monitoring, who are responsible for managing the stations.

Bac Ninh Province (formerly Bac Ninh) operates 30 water and air monitoring stations in total. Among them, one water station and one air station have been selected as pilot stations for this project. Through joint efforts with Bac Ninh authorities, the project aims to improve technical functions, strengthen maintenance capacity, and enhance human resource development to ensure proper operation of the stations.

On the final day, certificates of completion were presented by HORIBA Vietnam, which conducted the installation and training.


コメント